innovation and R&D

Our DNA

Research & Development and Innovation has been one of the keys to ISQ’s track record throughout nearly 50 years of its existence.
This characteristic is based on continuously anticipating the needs of the business environment and on the development of adequate response capabilities, based around 3 fundamental aspects:

  • Adequate facilities
  • Technologically advanced equipment
  • High-level human resources

 In partnership with over 1200 industrial and academic partners, both in Portugal and around the world, ISQ promotes the transfer of technology to industry, contributing to greater sustainability and development of the business fabric.

As a result of the R&D activities, emphasis should be placed on the recent applications of automated Phased Array and Guided Wave technology in oil industry facilities in Portugal and internationally, the application of life cycle assessment and Eco-Design in the development of new sustainable products, the smart monitoring of cathodic protection systems and the characterisation and control of coatings, and the use of automated Phased Array technology in Liquefied Natural Gas (LNG) tanks.


Centres for Research and Development + Innovation

ISQ’s R&D+i activity is coordinated around four centres, which address the priority areas.

ISQ has been a partner or coordinator in more than 500 R&D projects (since the 1980s) and participates in the IXV programmes (European Space Agency re-entry vehicle), ITER (International Thermonuclear Experimental Reactor), CERN (Large Hadron Collider), projects ALMA and E-ELT (European Extremely Large Telescope) of ESO (European Southern Observatory).

In the annual ranking of the 100 companies that spend the most on R&D activities in Portugal, published by GPEARI (Planning, Strategy, Assessment and International Relations Office) based on the Survey of National Scientific and Technological Potential, ISQ has continuously been among the top 50 in the period between 2007 and 2009.

Over this period its average investment was close to 5 million euros, and in 2009 it ranked 6th in terms of the number of PhD holders assigned to R&D activities, measured in Full Time Equivalents (FTE).

ITER

cs and plasma in tokamak us iter
INNOVATION & R&D 1

ITER is under construction in Saint-Paul-lez-Durance (Cadarache), southern France. The buildings and infrastructure required for “First Plasma” are 75% complete and the assembly of the equipment is underway. The first phase is expected to be completed by the end of 2025 with “First Plasma”.


From 2025 onwards, experiments will be conducted with gradual power increases, interspersed with process development periods. Start-up at full power is planned for 2035.

Assigned Teams


PORTUGAL · Oeiras

1st SEVERAL INSPECTORS CARRY OUT SPOT INSPECTIONS OF THE DIFFERENT F4E SUPPLIERS

SPAIN · F4E (Barcelona)

2nd MAGNETS, IN VESSEL, QUALITY TEAM

FRANCE · ITER Site (Cadarache)

3rd MAGNETS, QUALITY TEAM, PF COILS

4th CNIM (LA SEYNE SUR MER) – TF COIL

5th ATMOSTAT (PARIS) – IN VESSEL

ITALY · Walter Tosto

6th VACCUM VASSEL, BODY CASSETTE

7th MAGGIAROTTI (MONFALCONI) – VESSEL VACCUM

8th SIMIC (PORTO MARGHERA) — MAGNETS

CERN

For several years an ISQ team monitored the manufacturing and installation of different components, accessories and structures for what is considered one of the largest research projects of our time. Here, it all starts with a “simple” canister of hydrogen — “The Bottle to Bang”.

ESA

Over the last few years, ISQ and ESA have been partners in several projects, in particular the recent assessment of the availability and suitability of surface treatments as an alternative to those containing hexavalent chromium

CNES / ARIANESPACE – KOUROU

A team has been part of the quality assurance service since 2003, working in the areas of Soil Quality, Fluids and Mechanics, Safety, Onboard Quality and Satellites. Yet again, hydrogen functions here as the fuel for the main stage of Ariane 5.

ESO

ISQ’s current participation in the ELT (Extremely Large Telescope) project consists of maintaining a team at Quality Assurance in Garching (Munich), the ESO’s headquarters. The main mirror of the ELT will have a diameter of 39 metres, made up of 798 segments. The telescope will be the largest ever built and will be installed at Cerro Armazones, near Paranal, Chile.

More R&D+i Projects


||
INNOVATION & R&D 2

CERTIC

  Acronym: CERTIC Project name: Certification des acquis TIC dans le secteur non marchand  Grant agreement no: 2015-1-BE01-KA203-013202 Total cost: 27270,00€ Total funding: 27770,00€ CERTIC project's main objective is to enable trainers in the non-profit sector to be supported in their interventions and to...

Starting Year:  2015

Project Area: VET Projects

|||
INNOVATION & R&D 3

AdTech

  Acronym: AdTech Project name: AdTech – European Harmonized Training for Adhesive Bonding Technology Grant agreement no: 2015-1-PT01-KA202-012915 Total cost: 51995,00€ Total funding: 51995,00€ OBJECTIVES:  Adhesive usage is growing rapidly in Europe, as it represents a strong competitive advantage for companies and industries able...

Starting Year:  2015

Project Area: VET Projects

||
INNOVATION & R&D 4

ASHLEY

Acronym: ASHLEY Project Name: ASHLEY - Avionics Systems Hosted on a distributed modular electronics Large scale dEmonstrator for multiple tYpe of aircraft  Grant agreement no: 605442 Total cost: 39,8 M€ Total funding:  22,9 M€ OBJECTIVES:  In search for a more competitive, multiple types of aircrafts, IMA (Integrated...

Starting Year:  2013

Project Area: R&D and Innovation

NANOSENSORS

The main objective of the application of coatings to substrates is to protect and improve their performance and appearance. The introduction of coatings with sensory capacity allows to detect when the coating/substrate assembly is damaged and its performance is limited.

Starting Year

Project Area

CHRISTMAS

The aim of the project is to develop a new pretreatment process, harmless to the environment, for aluminum alloys used in construction and aeronautical applications. The project aims at advanced pre-treatments with additional functionality, i.e. conductivity and active anti-corrosion protection...

Starting Year

Project Area